The Mekong River Commission (MRC) Information and Knowledge Management Programme (IKMP) is developing and expanding its modeling framework. FutureWater was asked to support the process by developing a complete strategy and to prepare a set of tender documents for implementation of the strategy. The project resulted in six specific Program Implementation Plans (PMP) and six associated tender documents.
![](https://www.futurewater.nl/wp-content/uploads/2018/01/MekongPan.jpg)
Cambodia Laos Thailand VietnamRiver Basin ManagementHydrological Models and SPHY
Mekong River Basin Modeling Framework Development
Project details
Client: | Mekong River Commission Secretariat (MRCS) |
---|---|
Period: | 2007 |